各位大侠 小弟自己写了一个流固耦合的渗流模型
主要是想知道隧道开挖之后造成的渗流状况
并没有考虑衬砌
但是据说这种分析FLAC需要跑30000 STEP以上
我却只有跑了3200 STEP左右 渴望各位指点
以下是命令流
config gwflow
grid 20,20
m m
set large
gen circle 10,10 4
group 'Marble'
prop density=2600 bulk=2667E6 shear=1.6E9 cohesion=786384 friction=49.51 dilation=0.0 tension=178789 por=0.3 perm=1.0E-10
water dens=1000 bulk=0
fix x i=1
fix x i=21
fix y j=1
set gravity=9.81
set flow off
solve
save granw.sav
ini pp 196200 var 0 -196200 i 1 21 j 1 21
fix pp i 1
fix pp i 21
water bulk 1e4
set flow on mech off
solve
save graw.sav
ini xdis 0 ydis 0
model null region 10,10
water bulk 0
set flow off mech on
solve
save tunnel1.sav
initial pp 0.0 region 10 12
fix pp i 11 j 7 15
fix pp i 10 j 7 15
fix pp i 9 j 7 14
fix pp i 7 8 j 9 13
fix pp i 8 j 8
fix pp i 8 j 14
fix pp i 9 j 15
fix pp i 12 13 j 7 15
fix pp i 14 j 13 14
fix pp i 14 15 j 9 13
fix pp i 14 j 9
fix pp i 14 j 8
water bulk 1e4
set flow on mech off
solve
save tunnel2.sav