国外地基处理现场图片
\F
}s"# 1m5=Nu 
A closer view of the disk that breaks the imported soil down into smaller clods for effective moisture conditioning and compaction.
|sIr}} 
Backhoes carefully place large rocks (rip-rap) on the upstream face
c%bGVRhE 
The core materials are being disked (left side) and compacted by sheepsfoot rollers.
R
| &+g\{; 
The different colored soils correspond to the upstream shell (left side), core (darkest), filter, and drain zone (lightest), and downstream shell.