whether is it able to penetrate 3-6 kingposts at the other side of the pilecap, and temporary struts are utilized to support the short range of cantilever pile wall. *P.Dbb8vn
or a few temporary steel piles are installed at the formation level to the left side of the pile cap, inclined shorings are applied to resist the active force resulting from soil behind the boredpiles. `oq][|
this measures may not be costly economical.