1, bored piles construction. {&3{_Ml
(1) pre-construction preparation work !N"Y
a, site formation, removing debris, filling should be returned to ram a dense. s\/$`fuhx
b, set up networks and closed traverse senior municipal control point close to standardize requirements of precision, experience or after passing the wire, piles of points as the reference point lofting. Traverse the same points to close to accuracy. Pile-point in laying casing will be destroyed, so pile sites have been determined, the protection Add more than two piles. Checking with the protection of piles for the accuracy of cones. Ensure that the pile-point deviation to meet the requirements. Setting out in full measure station-theodolite, polar coordinates calculations. The distance between the pile-checking available Gangchi measure. J2Y
S+%K
c, digging mud pools, sedimentation tanks, storage pond, ready to pass or bentonite clay. 0*y|k1
d, connected to water and power supply. 'j&+Pg)@
e, laying casing, the casing around should be strengthened, higher than the top surface 30 cm, depth at the bottom of 1.5-2.0 m, casing pile diameter than the diameter of 20 cm, from top to bottom, integrity, casing the centerline plane deviation is less than 5 cm. General use of steel casing, the thick steel plate 0.8-1.0 cm. Casing artificial or mechanical means planted, and proved underground obstructions. MVDEVq0
f, remove underground obstructions. There may be some pipe network will occupy pile-must be bored pile construction, identify underground pipe network, as soon as possible to take measures to move out of the pile-on underground obstructions. ip)gI&kN`z
g, pile-place. Rack should be straight, steady-seat, not hard and soft uneven, the general pile driver Xiadianzhenmu. Drilling in the course of displacement and can not rack uneven subsidence. ^p7g[E&
h, mud indicators. Clay-16 "-17", sand 17 "-19", Sand rate of no more than 8 percent, more than 90 percent of colloidal rate, the proportion of about 1.2-1.4. Drilling mud direct impact on the quality of progress. S29k IJ
i, should be made of mud trough high 20 cm, width 30 cm, length of not less than 15 m, mud flow rate of not more than 10 cm / s. >n(Ga9E
j, borehole drilling machinery to use the roundabout. Design requirements into the bottom 2 m. . <?h,;]U
(2) Drilling =pa
F6!AB
a, it is necessary to firmly link drill, vertical, speed and do not fall in the early drilling in the 4.0 m-deep within, not more than 2 m / h, after no more than 3 m / h. In the cover should always decompression drilling, drilling mud and the rate of emissions suit. Punching drilling in the hole when the slower, less than 2.0 m deep hole, not exceeding 1.5 m / h.
Fm-D>PR
b, in the course of drilling, testing often indicators of changes in the mud, and pay attention to the adjustment of drilling mud concentration, the depth of 2-3 meters of underground water level, mud pressure over water pressure to meet construction specifications. Ng,<4;
c, carry out regular checks of equipment functioning, the unusual situation immediately for further investigation, the timely processing. Wire Rope and lubrication of the class must be checked. b_v {Q E<
d, small tools such as wrenches, hammer, bolt rope Qiaogun with insurance firm to prevent the fall into the hole. vXI2u;=y
e, often observed the attention of bored, cracking or near the ground there for extinguishers, whether the pile-tilt. mto=_|gn
f, strictly abide by the technical operation of a point of order, good drilling records. Records to reflect changes in the mud. 4;;K1< 1
g, drilling depth to the design, to the supervising engineer at the scene and construction units of the common judgement of personnel and accurate determination of deep holes. Elevation as the basis for the final hole. SOg>0VH)
=hAH6C
<&