thanks Mr Mano.....^_^ ;0;5+ J7
for the question 1..... I believe i use the correct construction step i used. Whichmeans, dewatering when excavation under water......and all excavation above water, no need to do " groundwater calculate", right? Hg`2-
Nl
3y]rhB
for the question 2..... For the sample "Lesson 4", The permeability of soil, i didn't change, whichmean the same as the example, and the construction time...i didn't put, under plastic condition only.....(the same as the example, which time = 0) *vP:+]
M<cm]
For my project, the permeabilty of soil is varies from 10^-6 m/s(sand)----10^-8 (Marine Clay). and also the analysis is under plastic condition. L^{wxOf&6E
u!9bhL`
thanks....