the process of sizing the structure begins by determining the required embedment,established under project criteria and the final exposed wall height,the combination of which is the full design height H for each section or station to be investigated.
谢谢高手了。我找了大半天也没有找出这个句子的主谓宾,不知道怎么翻译。这是一个完整的句子,没有疏漏。有关于加筋土挡墙设计的,具体的是加筋土挡墙的基础埋深确定。 非常感谢高手了